Syscont Ltd.

2000-2001 Tengiz Oil Field – Kazakhstan – with Honeywell Russia

Design, programming, implementation, commissioning and start up of a Distributed Control Systems (DCS) at Caustic neutralization and Crude degassing units and Waste water boiler – 2000-2001

Honeywell TPN system - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Enhanced Programmable Logic Controllers Gateway (EPLCG);

 - Network Interface Module (NIM) and

 - Universal Control Network (UCN), connecting:

 - High Performance Process Managers (HPM).

 

Back

 

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of the site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

I accept cookies from this site.
EU Cookie Directive plugin by www.channeldigital.co.uk