2005-2008 Petrobrazi Refinery – Ploesti - Romania – Units 120, 121, 130 and 131 |
Design, programming, Factory Acceptance Test (FAT), implementation, commissioning and start up of Distributed Control Systems (DCS) at production units 120, 121, 130 и 131 – 2005-2008 Honeywell TPS system - Local Control Network (LCN), connecting the following equipment: - Global Universal Stations (GUS); - History Module (HM); - Application Node (APP); - Network Interface Module (NIM) and - Universal Control Network (UCN), connecting: - High Performance Process Managers (HPM); - Fail Safety Controllers (FSC).
|