Syscont Ltd.

Deven AD - Devnya

 

1. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.6 – 1993-1995 and consecutive modifications – 2001

Honeywell MicroTDC System - Local Control Network (LCN) -1993, Honeywell TDC 3000 System - Local Control Network (LCN) – 2001, connecting the following equipment:

 - Universal Stations (US);

 - History Module (HM);

 - Application Module (AM);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - Advanced Process Managers (APM).

  

2. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.3 – 1998-1999

Honeywell TDC 3000 System - Local Control Network (LCN), connecting the following equipment:

 - Universal Stations (US);

 - History Module (HM);

 - Application Module (AM);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

3. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.1 – 2002

Honeywell TPN System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

4. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.5 – 2003

Honeywell TPN System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

5. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.2 – 2004

Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

6. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.4 – 2005

Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

7. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.2 – 2007

Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

8. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.7 – 2007-2009 and integration to the existing Honeywell TPS

 - Honeywell Experion PKS System, Profibus interface for communication with Siemens controllers;

 - Controllers C300.

 

9. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.1 – 2009

Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - High Performance Process Managers (HPM).

 

 10. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Plant unit “Coal fuel transport” – 2009 and integration to the existing Honeywell TPS

 

 - Honeywell Experion PKS System, Profibus interface for communication with third party controllers;

 - Controllers C300.

 

11. EPKS Upgrade

 - Honeywell Experion PKS System;

 - C300 Controllers.

 

12. Design, configuration, programming, implementation, acceptance tests, commissioning and start-up of a DCS for Boiler No.8 automation and control. Integration with the existing Honeywell TPS.

January – October 2016

 - Honeywell Experion PKS System R430,  Profibus Interface for integration with Siemens controllers and other third party systems and controllers;

- C300 controllers.

20091010-pic-hwell-52-sm

 

 

 

 

 

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of the site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

I accept cookies from this site.
EU Cookie Directive plugin by www.channeldigital.co.uk