1. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.6 – 1993-1995 and consecutive modifications – 2001
Honeywell MicroTDC System - Local Control Network (LCN) -1993, Honeywell TDC 3000 System - Local Control Network (LCN) – 2001, connecting the following equipment:
- Universal Stations (US);
- History Module (HM);
- Application Module (AM);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- Advanced Process Managers (APM).
2. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.3 – 1998-1999
Honeywell TDC 3000 System - Local Control Network (LCN), connecting the following equipment:
- Universal Stations (US);
- History Module (HM);
- Application Module (AM);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
3. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.1 – 2002
Honeywell TPN System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
4. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.5 – 2003
Honeywell TPN System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
5. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.2 – 2004
Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
6. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.4 – 2005
Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
7. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.2 – 2007
Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
8. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.7 – 2007-2009 and integration to the existing Honeywell TPS
- Honeywell Experion PKS System, Profibus interface for communication with Siemens controllers;
- Controllers C300.
9. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Turbine No.1 – 2009
Honeywell TPS System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Node (APP);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
10. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Plant unit “Coal fuel transport” – 2009 and integration to the existing Honeywell TPS
- Honeywell Experion PKS System, Profibus interface for communication with third party controllers;
- Controllers C300.
11. EPKS Upgrade
- Honeywell Experion PKS System;
- C300 Controllers.
12. Design, configuration, programming, implementation, acceptance tests, commissioning and start-up of a DCS for Boiler No.8 automation and control. Integration with the existing Honeywell TPS.
January – October 2016
- Honeywell Experion PKS System R430, Profibus Interface for integration with Siemens controllers and other third party systems and controllers;
- C300 controllers.

|