1. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Production unit Ethylene 250 – 1993-1994 and consecutive modifications - 1999
Honeywell TDC 2000 System – Data Hiway (DH) -1993, connecting the following equipment:
- Enhanced Operator Stations 520;
- Basic Controllers (BC);
- Multifunctional Controllers (MFC);
- Process Interface Units (PIU).
Operator stations exchange with a SCAN3000 SCADA system – 1999.
2. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Production unit Ethylene Oxide – 1998-1999
Honeywell TDC 3000 System - Local Control Network (LCN), connecting the following equipment:
- Global Universal Stations (GUS);
- History Module (HM);
- Application Module (AM);
- Network Interface Module (NIM) and
Universal Control Network (UCN), connecting
- High Performance Process Managers (HPM).
3. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Plant unit Compressors – 2003 - 2004
- Honeywell Experion PKS 100 System;
- Controllers Series 9000.
4. Design, programming and implementation of a Distributed Control System (DCS) at Alkylation Production unit – 2007 – 2008
- Honeywell Experion PKS System, Profibus interface to third parties equipment;
- Controllers C300.
5. Design, programming, Factory Acceptance Test (FAT), start-up and implementation of a Distributed Control System (DCS) at 6 Bed-PSA (Pressure Swing Absorption) Unit and Tail Gas Compressors – Hydrocracking Plant. February – October 2013.
- Honeywell EPKS Experion R410;
- C300 controllers.
6. Design, programming, Factory Acceptance Test (FAT) and start-up and implementation of a Distributed Control System (DCS) at PSA (Pressure Swing Absorption) unit – Second phase in Production unit "Hydrocracking".
November 2013 – March 2016
- Honeywell EPKS Experion R410;
- C300 controllers.
|