Projects in LUKOIL Neftochim AD - Burgas, Bulgaria |
1. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Production unit Ethylene 250 – 1993-1994 and consecutive modifications - 1999 Honeywell TDC 2000 System – Data Hiway (DH) -1993, connecting the following equipment: - Enhanced Operator Stations 520; - Basic Controllers (BC); - Multifunctional Controllers (MFC); - Process Interface Units (PIU). Operator stations exchange with a SCAN3000 SCADA system – 1999.
2. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Production unit Ethylene Oxide – 1998-1999 Honeywell TDC 3000 System - Local Control Network (LCN), connecting the following equipment: - Global Universal Stations (GUS); - History Module (HM); - Application Module (AM); - Network Interface Module (NIM) and Universal Control Network (UCN), connecting - High Performance Process Managers (HPM).
3. Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Plant unit Compressors – 2003 - 2004 - Honeywell Experion PKS 100 System; - Controllers Series 9000.
4. Design, programming and implementation of a Distributed Control System (DCS) at Alkylation Production unit – 2007 – 2008 - Honeywell Experion PKS System, Profibus interface to third parties equipment; - Controllers C300.
5. Design, programming, Factory Acceptance Test (FAT), start-up and implementation of a Distributed Control System (DCS) at 6 Bed-PSA (Pressure Swing Absorption) Unit and Tail Gas Compressors – Hydrocracking Plant. February – October 2013. - Honeywell EPKS Experion R410; - C300 controllers.
6. Design, programming, Factory Acceptance Test (FAT) and start-up and implementation of a Distributed Control System (DCS) at PSA (Pressure Swing Absorption) unit – Second phase in Production unit "Hydrocracking". November 2013 – March 2016 - Honeywell EPKS Experion R410; - C300 controllers.
|