| Steam and power generation |
|
Honeywell TDC 3000 System - Local Control Network (LCN) – 1993-1996, 1999, connecting the following equipment: - Universal Stations (US); - History Module (HM); - Application Module (AM); - Network Interface Module (NIM) and Universal Control Network (UCN), connecting - Advanced Process Managers (APM).
2. OC "Mladost" EAD – Vratsa - Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at CH Boilers – 1995-1996 - Honeywell Plantscape SCADA System; - Controllers Series 9000.
3. TEC "Bobov dol" AD - Design, programming, implementation, commissioning and start up of Distributed Control Systems (DCS) at Power Generation Units No.1, 2 and 3 – 2000-2004 Honeywell TPN 3000 System - Local Control Networks (LCN), connecting the following equipment: - Global Universal Stations (GUS); - History Module (HM); - Process History Data (PHD); - Application Node (APP); - Network Interface Module (NIM) and Universal Control Networks (UCN), connecting the following equipment: - High Performance Process Managers (HPM); - Fail Safety Controllers (FSC).
4. TEC "Maritsa Iztok 2" EAD - Design, programming, implementation, commissioning and start up of Distributed Control Systems (DCS) at Power Generation Units No.1, 3 and 4 – 2006-2009 - Honeywell Experion EPKS System; - Profibus Interface; - Controllers C200; - Safety Managers (SM).
5. TEC "Maritsa Iztok 2" EAD – Upgrade of the system and application software of all automation control systems in Units 1, 2 and 4. Redesign, programming and installation of the Power Plant Network. May – August 2012. - Honeywell Experion EPKS R301.3; - Profibus interface; - C200 controllers; - Safety Managers (ESD).
6. TEC "Maritsa Iztok 2" EAD – Design, configuration and programming of Distributed Control System (DCS) at Power Generation Unit No.7 – Functional Design Specification (FDS), Detail Design Specification (DDS). Lead Engineering. April – August 2013. - Honeywell Experion EPKS R410; - Profibus interface; - C300 controllers; - Safety Manager (ESD).
7. TEC "Maritsa Iztok 2" EAD – DCS acceptance tests, commissioning, on-site and start-up activities and "as built" documentation - Power Generation Unit No.7. March – December 2014 - Honeywell Experion EPKS R410; - Profibus Interface; - C300 controllers; - Safety Managers; - Network.
8. TEC "Maritsa Iztok 2" EAD – DCS Upgrade, Start-up and commissioning – Power generation Unit No.1. February – May 2015 - Honeywell Experion EPKS R410; - Profibus Interface; - C300 controllers; - Safety Managers; - Network.
|